// ShotMetrics

What is Release Curvature?

Whether a shot comes up short or long is decided in the last few inches of the release — a bend too small and too fast to see, but measuring it turns the least visible part of distance control into something you can coach.

Coach Dave Love
Coach Dave Love
NBA Shooting Coach · 8 min read

Improving how we coach shooting starts with understanding what separates a make from a miss. A shot can miss to the left or right, or it can miss short or long. This piece is about the second kind — the misses that come down to how well a player controls the distance of the shot.

Distance control was the mission when we set out to study the shot in the way that became our research paper on release curvature — the shape of the ball's path as it rises into the release (Slegers & Love, 2024). It gave us our first real clue about the habits that lead to better, or worse, control of distance. And like most things you can finally put a number to, it disproved a few ideas coaching had taken for granted for years.

Distance control lives in the ball path

Whether a shot is short, long, or perfect comes down to two things working together: the angle at which the ball is shot (its release angle) and how fast it’s moving (its velocity). With each shot there are a variety of different solutions that can result in the ball being shot the correct distance, and how well a shooter controls those variables will determine how well they control their distance.

Release-angle-versus-velocity curve for a single shot: a green band of angle and speed combinations that all send the ball the correct distance, with the optimal shot marked.
Click to enlarge
The green band is that family of solutions for a single shot: every combination of release angle and ball speed along it sends the ball the right distance, and the marked point is simply the most forgiving. (More on release angle and velocity in Launch Angle and Velocity.)

The point here is simple: once we could quantify the factors that contribute to distance control, we were then able to see who did this well and why.

The myth we set out to prove — and couldn’t

We went into this research with a belief that felt obvious. A smoother ball path — one without a sharp, pronounced change of direction — should give a player better distance control. It is the instinct behind a hundred cues: “one motion,” “smooth it out,” “no hitch.” We fully expected the data to confirm it.

It did not.

When we lined up the numbers, there was almost no correlation between how much a player’s ball path changed direction and how good a shooter they were. Excellent shooters with smooth paths, and excellent shooters with sharp, abrupt ones. Poor shooters with smooth paths, and poor shooters with sharp ones. The amount of change of direction — the thing coaching has fussed over for decades — simply did not predict who could shoot.

“In a research paper, we set out to prove that a smoother ball path makes a better shooter. The data said no. Smoother ball paths were not the common traits of better shooters.”

Tweet this

That is not a disappointing result. It is the entire reason you measure. A belief everyone shared, held for years, dissolved the moment we could put a number on it.

Different shots are shot differently

Quantifying the path also let us see something we had never been able to see clearly: different shots are shot differently. Line up a player’s free throws next to their in-game threes and the general shape of the ball path is usually not the same. In fact, most players show a bigger change of direction at the set point on their free throws — a less “smooth” path — on the very shot they make at a higher percentage than any other.

It is another crack in the smoothness myth, and our follow-up work on in-game NBA free throws found the same pattern (Zhu, Love & Powers, 2025).

“Even the best shooters have different shots. The shape of a free throw is not the shape of a three — even for the very best in the world.”

Tweet this

The top row is each player’s free throw; directly below, the same three players’ game threes:

Stephen Curry free-throw shooting motion with the ball-path S-curve traced from set point to release.
Stephen Curry — FT
Klay Thompson free-throw shooting motion with the ball-path S-curve traced from set point to release.
Klay Thompson — FT
Damian Lillard free-throw shooting motion with the ball-path S-curve traced from set point to release.
Damian Lillard — FT
Stephen Curry three-point shooting motion with the ball-path S-curve traced from set point to release.
Stephen Curry — 3PT
Klay Thompson three-point shooting motion with the ball-path S-curve traced from set point to release.
Klay Thompson — 3PT
Damian Lillard three-point shooting motion with the ball-path S-curve traced from set point to release.
Damian Lillard — 3PT

What actually mattered: the straight line into release

So if it is not overall smoothness, what is it? When we dug in, the signal was hiding in one specific stretch of the shot. It was not how straight the whole path was. It was how straight the ball traveled from the set point to release — and, most of all, how straight it ran in the last moments before it left the hand.

We measured two features of that S-shaped path: its biggest bend (the maximum curvature) and the bend right at the very end (the terminal curvature). Across thirty-one professional shooters, two results reshaped how I coach the finish of a shot (Slegers & Love, 2024):

  • The biggest bend was larger in the better shooters. Good shooters tended to have a clear two-part motion — a distinct gather, then a drive — rather than one fluid stroke. The sharp change of direction is not the enemy.
  • What separated them was the straightness at the very end. The straighter a player’s terminal path, the more consistent their release velocity — and release-velocity consistency is distance control. That relationship was strong: a correlation of about 0.73.

These two findings are not in conflict; they are about where on the path the curve lives. A big, deliberate change of direction early — the set point — is fine, even useful. What matters is that the path then settles into a straight line by the time the ball leaves the hand. The best shooters bend more at the set point and run straighter at release. That straightness in the final inches — how much the ball path is still curving as it leaves the hand — is what we mean by release curvature: less of it is better.

// The big idea

It is not the overall smoothness of the whole shot that matters. What predicts distance control is how straight the ball travels in the final moments, right before it leaves the hand.

Share

The difference looks like this — two shots side by side, one still curving as the ball leaves the hand, the other running straight through release:

A shooting motion whose ball path is still curving at release.
More release curvature — the path is still bending as the ball leaves the hand.
A shooting motion whose ball path runs straight through release.
Less release curvature — the path runs nearly straight through release.

You can see the same thing when you plot the curvature of the ball path across the release — for a strong shooter and a weaker one:

Curvature versus percent of release for a strong shooter, with a large early spike falling to near zero at release.
Click to enlarge
A strong shooter: a big curvature spike at the set point — the gather — that then collapses to almost nothing by release. Dead straight in the final inches.
Curvature versus percent of release for a weaker shooter, with curvature still rising at release.
Click to enlarge
A weaker release: the curvature is still climbing at the very end of the shot. The path is still bending as the ball leaves the hand — and distance control suffers.

“A big change of direction at the set point has been viewed as a flaw to correct. But the data suggests a more nuanced view is needed: the change of direction may offer value to those strong enough to use it.”

Tweet this

The difference is subtle — a few degrees of bend over a few inches, invisible in real time. It is also one of the clearest signals we have found for distance control.

Why quantifying the invisible matters

The last point matters most. You cannot see terminal curvature with your eyes. It happens too fast, in too small a space, on a ball moving too quickly. For as long as coaching has existed this piece of the shot has been invisible — so we guessed at it, and mostly we guessed smooth.

The moment you can measure it, two things change. You can tell a player something true about their finish instead of something that merely sounds right. And you can work backward — from the number to the movement — and ask which habits, in the gather and the wrist and the fingers, push a player toward a straighter release or a curved one. That is where the real coaching starts. Measuring the invisible does not replace coaching. It finally points it at the right thing.

// Measure it, don’t guess

CDL Shooting Toolbox

Release, arc, balance, and the ball path itself — the measurements behind everything I coach, in your hands to use on your own players. Free to try.

Explore the Toolbox

References

  1. Slegers, N., & Love, D. (2024). The role of ball path curvature in basketball shooting accuracy. Journal of Sports Sciences, 42(21), 2052–2060. https://doi.org/10.1080/02640414.2024.2422735
  2. Slegers, N., & Love, D. (2022). The role of ball backspin alignment and variability in basketball shooting accuracy. Journal of Sports Sciences, 40(12), 1360–1368. https://doi.org/10.1080/02640414.2022.2080164
  3. Zhu, J., Love, D., & Powers, S. (2025). Ball path curvature and in-game free-throw shooting proficiency in the NBA. Working paper, Rice University.
Coach Dave Love
// About the author

Coach Dave Love

NBA shooting coach trusted by pro teams, D1 programs, and national federations across three continents. Dave's evidence-based system has helped players from grassroots to the NBA rebuild and refine their shots.

// Don't miss the next one

Get pro-level shooting secrets, free

Weekly breakdowns like this one — the science, the drills, and the systems used at the highest level.